EICR Observation Codes Explained
Updated September 2026 for BS 7671:2018+A4:2026, the Orange Book. The previous edition is withdrawn on 15 October 2026, and this guide reflects how observations are classified under Amendment 4.
An EICR does more than say whether an installation is safe. It records specific findings, each one classified with a code, and those codes drive the report’s outcome. If you’re new to condition reports, or you’re a landlord who’s just been handed one with a page of C2s on it, this covers what the codes mean and what happens next.
What an observation code classifies
A code doesn’t describe the installation as a whole. It classifies one specific finding that doesn’t meet the requirements of BS 7671. A missing piece of bonding, an overloaded circuit, a socket with no earth. Each finding gets its own code, and one report can carry several different codes across several findings.
The code reflects the risk attached to that one finding, on the facts as found on the day. Two similar-looking faults can carry different codes depending on the circumstances around them. How a circuit is used, what’s connected to it, how accessible it is, whether other protective measures are already in place. Classification is the inspector’s professional judgement applied to BS 7671, rather than a fixed table of faults matched to codes.
That’s worth holding onto as you read the examples below. They’re there to show the kind of finding that tends to attract each code, not to be matched against what’s in front of you on site.
The four codes are C1, C2, C3 and FI. Amendment 4 keeps all four. It changes how FI is treated and how observations are laid out in the report, and this guide covers both.
C1, danger present
C1 means a danger exists right now and there’s a risk of injury. It calls for immediate action.
Where an inspector finds a C1, the usual response is to make that part of the installation safe before leaving the property, by isolating a circuit for example, where that can be done safely. Whoever instructed the inspection needs to be told straight away. Not left to be read on the paperwork later.
Findings that tend to be coded C1 include exposed live conductors somebody could touch, a consumer unit with a damaged enclosure leaving live parts accessible, or a socket outlet with live parts exposed behind a broken faceplate.
What happens next. The danger gets made safe or isolated before the report is even finished. The report records what was found and what was done about it.
C2, potentially dangerous
C2 means the finding is potentially dangerous should a fault or another condition occur, and it calls for urgent remedial action.
It ranks below C1 because there’s no live danger in front of the inspector on the day, but there’s a real risk if circumstances change. A fault develops, someone touches the wrong thing, a protective device doesn’t operate the way it should.
Findings that tend to be coded C2 include missing earthing or bonding where the installation requires it, an absent or non-functioning RCD where one is needed for the circuits it protects, or a protective device that doesn’t match the cable it’s protecting.
What happens next. The client needs the remedial work doing urgently. A C2 doesn’t require the electrician to stay on site and put it right there and then, the way a C1 does, but it shouldn’t be sitting there in six months either.
C3, improvement recommended
C3 flags something that falls short of current guidance without being dangerous, most often an installation which complied under an earlier edition of the regulations and hasn’t been brought up to current recommendations since.
Findings that tend to be coded C3 include missing circuit labelling at the consumer unit, or wiring in the old red and black colours with no warning notice at the board to say the installation contains a mix of colours.
What happens next. It’s a recommendation rather than a requirement. The client can act on it or leave it. There’s no urgency attached to a C3 on its own.
FI, further investigation advised
FI means the inspector found something they couldn’t fully assess within the scope of the inspection. A limitation on access, a symptom without an obvious cause, wiring that needs tracing before its condition can be judged. It doesn’t say a danger exists, and it doesn’t say everything is fine.
Amendment 4 changed the wording on this code. Further investigation was required without delay. Now it’s advised. An FI is treated like a C3, a piece of advice on the report, instead of being lumped in with the C1s and C2s that need putting right.
FI should also be rare. Most findings can be coded on the day, even within the limits of the inspection. An unidentified circuit is a non-compliance, so it gets coded. A low insulation resistance reading gets coded. Tracing the cause of either is remedial work, not inspection.
Findings that still warrant an FI include signs of overheating at a point that couldn’t be opened up during the visit, or an intermittent fault that wasn’t reproducible on the day.
What happens next. The report records what needs investigating. That’s now advice rather than a requirement, but until someone investigates, nobody knows whether a C1 or C2 is hiding behind it. Speak to the inspector before deciding it can wait.
The observations section now comes in two parts
Amendment 4 also restructured the observations section of the model report.
Section K is now divided in two. The first part records observations classified C1 or C2, the findings that make the report unsatisfactory and need remedial work. The second records C3 and FI, the recommendations and advisory items.
A note on the form explains the split. C3 and FI observations do not result in an unsatisfactory outcome. Separating them means whoever has the report can see at a glance which findings need putting right and which are advice.
X, and why it isn’t a fifth code
You may also see an X on a report. It isn’t a fifth classification.
It belongs to one place, section 1.0 of the inspection schedule, where the intake equipment gets a visual check. The service cable, service head, meter tails and the rest of the distributor’s kit. If an inadequacy is found, the item is marked X and a comment goes in section K, so the reason appears alongside everything else found on the day. Amendment 4 also makes clear that an outcome against an item in this section, other than access to live parts, doesn’t decide the overall outcome of the report. Everywhere else on the schedule, the codes are C1, C2, C3 and FI.
Shine Forms carries the X through to that observation automatically, so the schedule and the observations stay tied together.
How the codes decide the outcome
The overall result, satisfactory or unsatisfactory, follows from the codes recorded against the report.
Any C1 or C2 makes the report unsatisfactory.
C3 and FI don’t affect the outcome. A report carrying C3s and FIs and nothing worse is satisfactory. Under the previous edition an open FI meant the outcome couldn’t be confirmed as satisfactory, and Amendment 4 changes that. FI is now advisory.
If you’re a landlord or agent holding an unsatisfactory report, the next step is getting the C1 and C2 items put right by a qualified electrician, then having those items re-inspected and signed off. An FI on the report is still worth acting on. The private rented sector regulations in England refer to reports requiring further investigative or remedial work when setting out what landlords must do, so ask the electrician who produced the report whether an FI on yours triggers that duty.
A full new EICR isn’t always needed for any of this, so ask the electrician who produced the original report what they’d suggest.
How long you’ve got
Landlords in England work to a deadline set by the private rented sector electrical safety regulations. The report may specify a shorter period for a particular item, and where it does, that shorter period applies. Written confirmation that the work has been done then goes to the tenant and the local authority.
Scotland, Wales and Northern Ireland have their own arrangements, so check the position where the property is.
Which edition applies right now
Amendment 4 published on 15 April 2026. The previous edition, BS 7671:2018+A2:2022+A3:2024, is withdrawn on 15 October 2026. Between those dates both are current, so a report produced to either edition stands. From 15 October, EICRs are carried out to Amendment 4.
Consistent classification, wherever it happens
Because classification is a judgement call, the same finding can be coded differently by two inspectors, or by the same inspector on two different days. That’s professional judgement working as it should. It’s also a problem for a team producing reports under one name, and for a landlord comparing two reports on the same property from different visits.
Shine Forms ties codes to the specific schedule item they came from and generates the linked observation when an item is coded C1, C2, C3 or FI.
The wording and the code stay consistent with what’s recorded in the inspection schedule, whoever on the team carried out the inspection.
If you want to see how that fits together, our EICR software covers it. For the report as a whole, How to Fill in an EICR works through it section by section.